This 55,000 square foot project consisted of class 100,000 clean rooms and biopharm labs. The project required all new air handling equipment, CDA, DI water, gasses, and a generator for backup of specified equipment, and was design build mechanical, electrical, and plumbing. The building sits on a structural slab so all underground work needed to be accessed through floor access hatches. Running new plumbing required tunneling through the sub slab area. Due to the added weight, a significant amount of seismic retrofitting and structural upgrades were required. Done in phases, this project needed to be completed in and around existing operating labs: all services needed to be maintained to all labs throughout the project.
(Project completed for Genomic Health prior to merger with Exact Sciences.)
![genomic-histopathology-1](https://www.scbuildersinc.com/wp-content/uploads/2019/04/genomic-histopathology-1.jpg)
DETAILS
Exact Sciences
Redwood City, CA
Lab Renovations
55,000 SF
![genomic-histopathology-2](https://www.scbuildersinc.com/wp-content/uploads/2019/04/genomic-histopathology-2.jpg)
![genomic-histopathology-3](https://www.scbuildersinc.com/wp-content/uploads/2019/04/genomic-histopathology-3.jpg)