Skip to content
Exact Sciences Histopathology Lab

This 55,000 square foot project consisted of class 100,000 clean rooms and biopharm labs. The project required all new air handling equipment, CDA, DI water, gasses, and a generator for backup of specified equipment, and was design build mechanical, electrical, and plumbing. The building sits on a structural slab so all underground work needed to be accessed through floor access hatches. Running new plumbing required tunneling through the sub slab area. Due to the added weight, a significant amount of seismic retrofitting and structural upgrades were required. Done in phases, this project needed to be completed in and around existing operating labs: all services needed to be maintained to all labs throughout the project.

(Project completed for Genomic Health prior to merger with Exact Sciences.)

DETAILS

Client

Exact Sciences

Location

Redwood City, CA

Project Type

Lab Renovations

Size

55,000 SF

Architect

DGA

Project Office
Silicon Valley
Project Executive
Steve Dunne
Steve Dunne
408.328.0688

SIMILAR PROJECTS
Exact Sciences Histopathology Lab
Back To Top
Search